EXPERIENCE

RECENT PROJECTS

Sandusky Bay Initiative: Raccoon Creek Natural Shoreline Project

The Nature Conservancy

Feburary 2024 – October 2025 (ongoing)
Vickery, Ohio

Restoration of wetlands to process nutrients and remove nutrient ladent sediments, reduce sediment resuspension and promote the establishment of submergent and emergency aquatic vegetation in Sandusky Bay. This is the first project in the Sandusky Bay Initiative. Littoral Services has been subcontracted to provide in-water technical support, Blanding’s Turtle avoidance and minimization services, and will oversee all planting, wildlife mitigation, invasive species management, replanting, and post-restoration monitoring.

Battery Park Marina Geotechnical Investigation-Marine Package

Intertek PSI Cleveland

June 2024
Sandusky, Ohio

Support Intertek/PSI Cleveland with the collection of the water-based geotechnical borings in Sandusky Bay and wihtin the active Battery Part Marina during the active boating/marina season.

Islander Woods Preserve & Trailhead Ecological Restoration Services

Park District of Ottawa County

August 2024 – December 2024
Catawba Island, Ohio

Support the Park District with ecological restoration planning at a newly acquired property and the providing invasive species and native seeding field services to implement ecological restoration strategy.

Maumee River International Dock Condition Inspection

Metroparks Toledo

July 2024 – September 2024
Toledo, Ohio

Above and below the waterline condition inspection and assessment of capital investments to reactivate the dock to receive Great Lakes cruise ships.

East BAy Channel Association Dredging Design Build Services

East Bay Channel Association

February 2024 – July 2024
Sandusky, Ohio

Dredge permit modifications and compliance, hydrographic surveying dredge material management planning, dredging contract document preparation, beneficial reuse alternatives analysis, and dredging contracting services.

Townsend Beach Shoreline Revetment Project

September 2024 – December 2024
Lakeside-Marblehead, Ohio

Rehabilitation design of existing armor stone revetment, development of construction documents, and filing of the state and federal permitting necessary to advance work.

CONTACT US

Use the form or call us to discuss your unique project needs

 

Contact us about your waterfront infrastructure needs using the form below

10 + 12 =